top of page

WORK

 

project architect

DOUBLEDAY HILL HOUSE

under construction: Killington, Vermont

- complete renovation of 2-story house (4 bedrooms, 3 bathrooms) including structural modifications and new mechanical, electrical, and plumbing systems

- conversion of 2-story garage storage space to studio dwelling unit

project manager (Office of Charles F. Bloszies, FAIA)

CATHEDRAL SCHOOL FOR BOYS

2019-22: San Francisco, California

- renovation of existing school building (classrooms, offices, common spaces, restrooms, play yard)

- 2-story addition adjacent to Grace Cathedral; steel structure with aluminum and glass curtain wall

- 8 month construction duration, phased to avoid interruption to academic calendar

360 SPEAR STREET

2018-20: San Francisco, California

- conversion of 5-story data center to Class A office use

- new storefront, lobby, and building amenity spaces

- new mechanical, electrical, and fire-protection systems; new gas meter and piping

- major structural alterations: new openings made in existing concrete shear walls, reinforced with carbon fiber wrap

HOMEKEY MOUNTAIN VIEW

2020-21: Mountain View, California

- 100-unit (1 ac.) interim supportive housing facility for formerly homeless individuals

- all structures prefabricated off-site; 6 month construction duration

- winner, 2022 Urban Land Institute Americas Awards for Excellence

designer (Office of Charles F. Bloszies, FAIA)

SAN MATEO COUNTY NAVIGATION CENTER

2021-23: Redwood City, California

- 240-unit (2.5 ac.) interim supportive housing facility for formerly homeless individuals

- all sleeping units and offices prefabricated off-site; 13 month construction duration

- winner, 2023 ENRCalifornia Awards of Merit: Government/Public Building and Sustainability

BLU DOT

2020-22: San Francisco, California

- combination of adjacent industrial buildings to create a showroom for high-design furniture retailer Blu Dot

- new mechanical, electrical, plumbing, and fire-protection systems

- major structural alterations: removal of extraneous seismic bracing, new floor slabs

bottom of page