Mark Warren
WORK
project architect
​
​
DOUBLEDAY HILL HOUSE​
​
under construction: Killington, Vermont
​
- complete renovation of 2-story house (4 bedrooms, 3 bathrooms) including structural modifications and new mechanical, electrical, and plumbing systems
​
- conversion of 2-story garage storage space to studio dwelling unit
​
​
​
​
project manager (Office of Charles F. Bloszies, FAIA)
​
​
CATHEDRAL SCHOOL FOR BOYS​
​
2019-22: San Francisco, California
​
- renovation of existing school building (classrooms, offices, common spaces, restrooms, play yard)
- 2-story addition adjacent to Grace Cathedral; steel structure with aluminum and glass curtain wall
- 8 month construction duration, phased to avoid interruption to academic calendar
​
​
360 SPEAR STREET​
​
2018-20: San Francisco, California
​
- conversion of 5-story data center to Class A office use
- new storefront, lobby, and building amenity spaces
- new mechanical, electrical, and fire-protection systems; new gas meter and piping
- major structural alterations: new openings made in existing concrete shear walls, reinforced with carbon fiber wrap
​
​
HOMEKEY MOUNTAIN VIEW​
​
2020-21: Mountain View, California
​
- 100-unit (1 ac.) interim supportive housing facility for formerly homeless individuals
- all structures prefabricated off-site; 6 month construction duration
- winner, 2022 Urban Land Institute Americas Awards for Excellence
​
​
​
designer (Office of Charles F. Bloszies, FAIA)
​
​
SAN MATEO COUNTY NAVIGATION CENTER
​
2021-23: Redwood City, California
​
- 240-unit (2.5 ac.) interim supportive housing facility for formerly homeless individuals
- all sleeping units and offices prefabricated off-site; 13 month construction duration
- winner, 2023 ENRCalifornia Awards of Merit: Government/Public Building and Sustainability
​
​
BLU DOT
​
2020-22: San Francisco, California
​
- combination of adjacent industrial buildings to create a showroom for high-design furniture retailer Blu Dot
- new mechanical, electrical, plumbing, and fire-protection systems
- major structural alterations: removal of extraneous seismic bracing, new floor slabs
​